Native Oaks Golf Club
AvailableEV charging station in Valley Center, California on the Evolv Charging network — 12 DC fast · 2 Level 2. US DOE AFDC station 470320.
At a glance
Native Oaks Golf Club is a public EV charging station at 14616 Woods Valley Rd in Valley Center, California, on the Evolv Charging network. It has 14 charging ports (12 DC fast · 2 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Aug 11, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 470320 |
| Network | Evolv Charging |
| Status | Available (E) |
| Access | Public |
| Facility | Rec Sports Facility |
| Open date | Aug 11, 2024 |
| Last updated at source | Sep 23, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: $0.55 per kWh
Location
- Address
- 14616 Woods Valley Rd
- City
- Valley Center
- State
- California
- ZIP
- 92082
- Coordinates
- 33.20696, -117.01127
Within ~15 km
Nearby charging
- 101 Chamomile Gln44 ports
Loop · Available
- Red Rock Center28 ports
Nayax Energy · Planned
Tesla Supercharger · Available
- San Marcos20 ports
ViaLynk · Available
Tesla Supercharger · Available
- Santar Place20 ports
Evolv Charging · Available
What kind of charging does Native Oaks Golf Club offer?
Of its 14 ports, 12 are DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.7 times the California average of 3.7 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector. Pricing as reported to the registry: “$0.55 per kWh”. The site is listed as a rec sports facility location.
How does Native Oaks Golf Club compare with other stations in Valley Center?
Valley Center has 12 charging stations in the DOE registry with 56 ports. Native Oaks Golf Club accounts for 25% of the charging ports in Valley Center. Evolv Charging runs 2 stations in Valley Center. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Native Oaks Golf Club?
Evolv Charging operates 95 stations in the registry across 1 states, with 746 DC fast and 632 Level 2 ports in total. 95 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 11, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Sep 23, 2026.
Frequently asked questions
How many chargers does Native Oaks Golf Club have?
Native Oaks Golf Club has 14 charging ports: 12 DC fast · 2 Level 2.
Does Native Oaks Golf Club have DC fast charging?
Yes. The registry lists 12 DC fast ports at Native Oaks Golf Club, with CHAdeMO and CCS connectors.
What connectors does Native Oaks Golf Club have?
Native Oaks Golf Club has CHAdeMO, J1772 and CCS connectors.
Is charging at Native Oaks Golf Club free?
Pricing as reported to the DOE registry: $0.55 per kWh.
Is Native Oaks Golf Club open to the public?
Yes. Native Oaks Golf Club is listed with public access, and its status is available.
Where is Native Oaks Golf Club?
Native Oaks Golf Club is at 14616 Woods Valley Rd, Valley Center, CA 92082. Its coordinates are 33.20696, -117.01127.
More EV charging around Valley Center
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 470320, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Native Oaks Golf Club, Valley Center, CA (AFDC station 470320)”, https://chargecensus.com/stations/california/native-oaks-golf-club-470320 (data as of October 12, 2026).