Mosaic Parking Structure - Alhambra
AvailableEV charging station in Alhambra, California on the EVCS network — 6 Level 2. US DOE AFDC station 429903.
At a glance
Mosaic Parking Structure - Alhambra is a public EV charging station at 26 North 1st Street in Alhambra, California, on the EVCS network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 15, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 429903 |
| Network | EVCS |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 15, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 26 North 1st Street
- City
- Alhambra
- State
- California
- ZIP
- 91801
- Coordinates
- 34.09547, -118.12813
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
Non-networked · Available
Non-networked · Available
- LADWP - Lincoln Heights District73 ports
Non-networked · Available
Non-networked · Available
- Caltech - California Garage71 ports
PowerFlex · Available
What kind of charging does Mosaic Parking Structure - Alhambra offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 60% above the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mosaic Parking Structure - Alhambra compare with other stations in Alhambra?
Alhambra has 10 charging stations in the DOE registry with 130 ports. Mosaic Parking Structure - Alhambra accounts for 5% of the charging ports in Alhambra. EVCS runs 3 stations in Alhambra. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Mosaic Parking Structure - Alhambra?
EVCS operates 277 stations in the registry across 3 states, with 890 DC fast and 705 Level 2 ports in total. 200 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 15, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mosaic Parking Structure - Alhambra have?
Mosaic Parking Structure - Alhambra has 6 charging ports: 6 Level 2.
Does Mosaic Parking Structure - Alhambra have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does Mosaic Parking Structure - Alhambra have?
Mosaic Parking Structure - Alhambra has J1772 connectors.
Is Mosaic Parking Structure - Alhambra open to the public?
Yes. Mosaic Parking Structure - Alhambra is listed with public access, and its status is available.
Where is Mosaic Parking Structure - Alhambra?
Mosaic Parking Structure - Alhambra is at 26 North 1st Street, Alhambra, CA 91801. Its coordinates are 34.09547, -118.12813.
More EV charging around Alhambra
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 429903, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mosaic Parking Structure - Alhambra, Alhambra, CA (AFDC station 429903)”, https://chargecensus.com/stations/california/mosaic-parking-structure-alhambra-429903 (data as of October 12, 2026).