Meta Mpk23-03
AvailableEV charging station in Menlo Park, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 170488.
At a glance
Meta Mpk23-03 is a public EV charging station at 300 Constitution Dr MPK 23 in Menlo Park, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 24, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 170488 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 24, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 300 Constitution Dr MPK 23
- City
- Menlo Park
- State
- California
- ZIP
- 94025
- Coordinates
- 37.48160, -122.16750
Within ~15 km
Nearby charging
- Google226 ports
ChargePoint · Available
Tesla Destination · Available
- Google142 ports
ChargePoint · Available
ChargePoint · Available
- 23andMe - Headquarters73 ports
PowerFlex · Available
- Ames Research Center63 ports
Non-networked · Available
What kind of charging does Meta Mpk23-03 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Meta Mpk23-03 compare with other stations in Menlo Park?
Menlo Park has 331 charging stations in the DOE registry with 713 ports, the 8th-most of 812 cities and towns in California. Meta Mpk23-03 accounts for under 1% of the charging ports in Menlo Park. ChargePoint runs 309 stations in Menlo Park. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Meta Mpk23-03?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 24, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Meta Mpk23-03 have?
Meta Mpk23-03 has 2 charging ports: 2 Level 2.
Does Meta Mpk23-03 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Meta Mpk23-03 have?
Meta Mpk23-03 has J1772 connectors.
Is Meta Mpk23-03 open to the public?
Yes. Meta Mpk23-03 is listed with public access, and its status is available.
Where is Meta Mpk23-03?
Meta Mpk23-03 is at 300 Constitution Dr MPK 23, Menlo Park, CA 94025. Its coordinates are 37.48160, -122.16750.
More EV charging around Menlo Park
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 170488, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Meta Mpk23-03, Menlo Park, CA (AFDC station 170488)”, https://chargecensus.com/stations/california/meta-mpk23-03-170488 (data as of October 12, 2026).