Meta Mpk21.9-09
AvailableEV charging station in Menlo Park, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 177260.
At a glance
Meta Mpk21.9-09 is a public EV charging station at 1 Meta Way MPK 21 in Menlo Park, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 177260 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 Meta Way MPK 21
- City
- Menlo Park
- State
- California
- ZIP
- 94025
- Coordinates
- 37.48105, -122.16061
Within ~15 km
Nearby charging
- Google226 ports
ChargePoint · Available
Tesla Destination · Available
- Google142 ports
ChargePoint · Available
- Google83 ports
ChargePoint · Available
ChargePoint · Available
- 23andMe - Headquarters73 ports
PowerFlex · Available
What kind of charging does Meta Mpk21.9-09 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Meta Mpk21.9-09 compare with other stations in Menlo Park?
Menlo Park has 331 charging stations in the DOE registry with 713 ports, the 8th-most of 812 cities and towns in California. Meta Mpk21.9-09 accounts for under 1% of the charging ports in Menlo Park. ChargePoint runs 309 stations in Menlo Park. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Meta Mpk21.9-09?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Meta Mpk21.9-09 have?
Meta Mpk21.9-09 has 2 charging ports: 2 Level 2.
Does Meta Mpk21.9-09 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Meta Mpk21.9-09 have?
Meta Mpk21.9-09 has J1772 connectors.
Is Meta Mpk21.9-09 open to the public?
Yes. Meta Mpk21.9-09 is listed with public access, and its status is available.
Where is Meta Mpk21.9-09?
Meta Mpk21.9-09 is at 1 Meta Way MPK 21, Menlo Park, CA 94025. Its coordinates are 37.48105, -122.16061.
More EV charging around Menlo Park
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 177260, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Meta Mpk21.9-09, Menlo Park, CA (AFDC station 177260)”, https://chargecensus.com/stations/california/meta-mpk21-9-09-177260 (data as of October 12, 2026).