Madera County Gc-1st Floor
AvailableEV charging station in Madera, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 160366.
At a glance
Madera County Gc-1st Floor is a public EV charging station at 200 N G St in Madera, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 160366 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 200 N G St
- City
- Madera
- State
- California
- ZIP
- 93637
- Coordinates
- 36.96137, -120.06315
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- EZ Trip Travel Center #127510 ports
Non-networked · Available
- Walmart 1583 (Madera, CA)6 ports
Electrify America · Available
- The Crossroads Shopping Mall6 ports
EVgo · Available
- Michiel4 ports
Non-networked · Available
Non-networked · Available
What kind of charging does Madera County Gc-1st Floor offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Madera County Gc-1st Floor compare with other stations in Madera?
Madera has 25 charging stations in the DOE registry with 86 ports. Madera County Gc-1st Floor accounts for 2% of the charging ports in Madera. ChargePoint runs 13 stations in Madera. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Madera County Gc-1st Floor?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Madera County Gc-1st Floor have?
Madera County Gc-1st Floor has 2 charging ports: 2 Level 2.
Does Madera County Gc-1st Floor have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Madera County Gc-1st Floor have?
Madera County Gc-1st Floor has J1772 connectors.
Is Madera County Gc-1st Floor open to the public?
Yes. Madera County Gc-1st Floor is listed with public access, and its status is available.
Where is Madera County Gc-1st Floor?
Madera County Gc-1st Floor is at 200 N G St, Madera, CA 93637. Its coordinates are 36.96137, -120.06315.
More EV charging around Madera
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 160366, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Madera County Gc-1st Floor, Madera, CA (AFDC station 160366)”, https://chargecensus.com/stations/california/madera-county-gc-1st-floor-160366 (data as of October 12, 2026).