Library Host Library 1 Ngw
AvailableEV charging station in Merced, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 160717.
At a glance
Library Host Library 1 Ngw is a public EV charging station at 5200 Lake Rd in Merced, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 160717 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5200 Lake Rd
- City
- Merced
- State
- California
- ZIP
- 95343
- Coordinates
- 37.36619, -120.42531
Within ~15 km
Nearby charging
- University of California Merced24 ports
Blink · Available
- Rancho San Miguel Markets20 ports
Nayax Energy · Available
Tesla Supercharger · Available
- Castle Airport Brewery6 ports
EVCS · Available
- Merced Community College4 ports
EV Connect · Available
- Ossc Station 42 ports
ChargePoint · Available
What kind of charging does Library Host Library 1 Ngw offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Library Host Library 1 Ngw compare with other stations in Merced?
Merced has 21 charging stations in the DOE registry with 86 ports. Library Host Library 1 Ngw accounts for 1% of the charging ports in Merced. ChargePoint runs 11 stations in Merced. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Library Host Library 1 Ngw?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Library Host Library 1 Ngw have?
Library Host Library 1 Ngw has 1 charging port: 1 Level 2.
Does Library Host Library 1 Ngw have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Library Host Library 1 Ngw have?
Library Host Library 1 Ngw has J1772 connectors.
Is Library Host Library 1 Ngw open to the public?
Yes. Library Host Library 1 Ngw is listed with public access, and its status is available.
Where is Library Host Library 1 Ngw?
Library Host Library 1 Ngw is at 5200 Lake Rd, Merced, CA 95343. Its coordinates are 37.36619, -120.42531.
More EV charging around Merced
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 160717, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Library Host Library 1 Ngw, Merced, CA (AFDC station 160717)”, https://chargecensus.com/stations/california/library-host-library-1-ngw-160717 (data as of October 12, 2026).