ChargeCensus

Larwin Square

Available

EV charging station in Tustin, California on the EVgo network — 2 DC fast · 1 Level 2. US DOE AFDC station 228245.

At a glance

Larwin Square is a public EV charging station at 654 E 1st St in Tustin, California, on the EVgo network. It has 3 charging ports (2 DC fast · 1 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 7, 2018.

Total ports
3
DC fast
2
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID228245
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateMar 7, 2018
Last updated at sourceOct 11, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
654 E 1st St
City
Tustin
ZIP
92780
Coordinates
33.74546, -117.81699

Within ~15 km

Nearby charging

What kind of charging does Larwin Square offer?

Of its 3 ports, 2 are DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 20% below the California average of 3.7 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Larwin Square compare with other stations in Tustin?

Tustin has 57 charging stations in the DOE registry with 205 ports. Larwin Square accounts for 1% of the charging ports in Tustin. EVgo runs 2 stations in Tustin. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Larwin Square?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 7, 2018, one of 330 stations in California with a 2018 open date. The station's record was last updated at the source on Oct 11, 2026.

Frequently asked questions

How many chargers does Larwin Square have?

Larwin Square has 3 charging ports: 2 DC fast · 1 Level 2.

Does Larwin Square have DC fast charging?

Yes. The registry lists 2 DC fast ports at Larwin Square, with CHAdeMO and CCS connectors.

What connectors does Larwin Square have?

Larwin Square has CHAdeMO, J1772 and CCS connectors.

Is Larwin Square open to the public?

Yes. Larwin Square is listed with public access, and its status is available.

Where is Larwin Square?

Larwin Square is at 654 E 1st St, Tustin, CA 92780. Its coordinates are 33.74546, -117.81699.

More EV charging around Tustin

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 228245, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Larwin Square, Tustin, CA (AFDC station 228245)”, https://chargecensus.com/stations/california/larwin-square-228245 (data as of October 12, 2026).