ChargeCensus

Kon Tiki Inn Station-2

Available

EV charging station in Pismo Beach, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 456636.

At a glance

Kon Tiki Inn Station-2 is a public EV charging station at 1621 Price Street in Pismo Beach, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Apr 1, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID456636
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 1, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1621 Price Street
ZIP
93449
Coordinates
35.14548, -120.64600

Within ~15 km

Nearby charging

What kind of charging does Kon Tiki Inn Station-2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector.

How does Kon Tiki Inn Station-2 compare with other stations in Pismo Beach?

Pismo Beach has 22 charging stations in the DOE registry with 64 ports. Kon Tiki Inn Station-2 accounts for 3% of the charging ports in Pismo Beach. ChargePoint runs 7 stations in Pismo Beach. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Kon Tiki Inn Station-2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 1, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Kon Tiki Inn Station-2 have?

Kon Tiki Inn Station-2 has 2 charging ports: 2 Level 2.

Does Kon Tiki Inn Station-2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Kon Tiki Inn Station-2 have?

Kon Tiki Inn Station-2 has J1772 and NACS (Tesla) connectors.

Is Kon Tiki Inn Station-2 open to the public?

Yes. Kon Tiki Inn Station-2 is listed with public access, and its status is available.

Where is Kon Tiki Inn Station-2?

Kon Tiki Inn Station-2 is at 1621 Price Street, Pismo Beach, CA 93449. Its coordinates are 35.14548, -120.64600.

More EV charging around Pismo Beach

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 456636, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Kon Tiki Inn Station-2, Pismo Beach, CA (AFDC station 456636)”, https://chargecensus.com/stations/california/kon-tiki-inn-station-2-456636 (data as of October 12, 2026).