ChargeCensus

Jelly Belly

Available

EV charging station in Fairfield, California on the EV Connect network — 2 DC fast · 4 Level 2. US DOE AFDC station 163948.

At a glance

Jelly Belly is a public EV charging station at 1 Jelly Belly Ln in Fairfield, California, on the EV Connect network. It has 6 charging ports (2 DC fast · 4 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Jun 26, 2020.

Total ports
6
DC fast
2
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID163948
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateJun 26, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
1 Jelly Belly Ln
ZIP
94533
Coordinates
38.23919, -122.07868

Within ~15 km

Nearby charging

What kind of charging does Jelly Belly offer?

Of its 6 ports, 2 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 60% above the California average of 3.7 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Jelly Belly compare with other stations in Fairfield?

Fairfield has 59 charging stations in the DOE registry with 270 ports. Jelly Belly accounts for 2% of the charging ports in Fairfield. It is the only EV Connect station in Fairfield. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Jelly Belly?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 227 of those stations are in California, 1% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 26, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Jelly Belly have?

Jelly Belly has 6 charging ports: 2 DC fast · 4 Level 2.

Does Jelly Belly have DC fast charging?

Yes. The registry lists 2 DC fast ports at Jelly Belly, with CHAdeMO and CCS connectors.

What connectors does Jelly Belly have?

Jelly Belly has CHAdeMO, J1772 and CCS connectors.

Is Jelly Belly open to the public?

Yes. Jelly Belly is listed with public access, and its status is available.

Where is Jelly Belly?

Jelly Belly is at 1 Jelly Belly Ln, Fairfield, CA 94533. Its coordinates are 38.23919, -122.07868.

More EV charging around Fairfield

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 163948, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Jelly Belly, Fairfield, CA (AFDC station 163948)”, https://chargecensus.com/stations/california/jelly-belly-163948 (data as of October 12, 2026).