Inyokern
AvailableEV charging station in Inyokern, California on the EV Connect network — 1 DC fast · 2 Level 2. US DOE AFDC station 183939.
At a glance
Inyokern is a public EV charging station at 1669 Airport Rd in Inyokern, California, on the EV Connect network. It has 3 charging ports (1 DC fast · 2 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Oct 16, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 183939 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 16, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1669 Airport Rd
- City
- Inyokern
- State
- California
- ZIP
- 93527
- Coordinates
- 35.65302, -117.82697
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Tivoli Centre6 ports
EVgo · Available
- Inyokern, CA6 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
Rivian Waypoints · Available
- Dc Corridor Inyokern L22 ports
ChargePoint · Available
What kind of charging does Inyokern offer?
Of its 3 ports, 1 is DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 20% below the California average of 3.7 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Inyokern compare with other stations in Inyokern?
Inyokern has 8 charging stations in the DOE registry with 31 ports. Inyokern accounts for 10% of the charging ports in Inyokern. It is the only EV Connect station in Inyokern. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Inyokern?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 227 of those stations are in California, 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 16, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Inyokern have?
Inyokern has 3 charging ports: 1 DC fast · 2 Level 2.
Does Inyokern have DC fast charging?
Yes. The registry lists 1 DC fast port at Inyokern, with CHAdeMO and CCS connectors.
What connectors does Inyokern have?
Inyokern has CHAdeMO, J1772 and CCS connectors.
Is Inyokern open to the public?
Yes. Inyokern is listed with public access, and its status is available.
Where is Inyokern?
Inyokern is at 1669 Airport Rd, Inyokern, CA 93527. Its coordinates are 35.65302, -117.82697.
More EV charging around Inyokern
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 183939, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Inyokern, Inyokern, CA (AFDC station 183939)”, https://chargecensus.com/stations/california/inyokern-183939 (data as of October 12, 2026).