ChargeCensus

Inno Phase 1

Available

EV charging station in Fremont, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 371419.

At a glance

Inno Phase 1 is a public EV charging station at 45099 Impress Common in Fremont, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 16, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID371419
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 16, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
45099 Impress Common
ZIP
94538
Coordinates
37.49948, -121.94775

Within ~15 km

Nearby charging

What kind of charging does Inno Phase 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Inno Phase 1 compare with other stations in Fremont?

Fremont has 133 charging stations in the DOE registry with 487 ports. Inno Phase 1 accounts for under 1% of the charging ports in Fremont. ChargePoint runs 94 stations in Fremont. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Inno Phase 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 16, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Inno Phase 1 have?

Inno Phase 1 has 2 charging ports: 2 Level 2.

Does Inno Phase 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Inno Phase 1 have?

Inno Phase 1 has J1772 connectors.

Is Inno Phase 1 open to the public?

Yes. Inno Phase 1 is listed with public access, and its status is available.

Where is Inno Phase 1?

Inno Phase 1 is at 45099 Impress Common, Fremont, CA 94538. Its coordinates are 37.49948, -121.94775.

More EV charging around Fremont

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 371419, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Inno Phase 1, Fremont, CA (AFDC station 371419)”, https://chargecensus.com/stations/california/inno-phase-1-371419 (data as of October 12, 2026).