ChargeCensus

In-N-Out Harder 03

Available

EV charging station in Hayward, California on the ChargePoint network — 1 DC fast. US DOE AFDC station 447469.

At a glance

In-N-Out Harder 03 is a public EV charging station at 709 Harder Rd in Hayward, California, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Dec 15, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID447469
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 15, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
709 Harder Rd
ZIP
94544
Coordinates
37.65064, -122.06786

Within ~15 km

Nearby charging

What kind of charging does In-N-Out Harder 03 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.

How does In-N-Out Harder 03 compare with other stations in Hayward?

Hayward has 123 charging stations in the DOE registry with 363 ports. In-N-Out Harder 03 accounts for under 1% of the charging ports in Hayward. ChargePoint runs 96 stations in Hayward. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates In-N-Out Harder 03?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 15, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does In-N-Out Harder 03 have?

In-N-Out Harder 03 has 1 charging port: 1 DC fast.

Does In-N-Out Harder 03 have DC fast charging?

Yes. The registry lists 1 DC fast port at In-N-Out Harder 03, with CCS and NACS (Tesla) connectors.

What connectors does In-N-Out Harder 03 have?

In-N-Out Harder 03 has CCS and NACS (Tesla) connectors.

Is In-N-Out Harder 03 open to the public?

Yes. In-N-Out Harder 03 is listed with public access, and its status is available.

Where is In-N-Out Harder 03?

In-N-Out Harder 03 is at 709 Harder Rd, Hayward, CA 94544. Its coordinates are 37.65064, -122.06786.

More EV charging around Hayward

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 447469, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “In-N-Out Harder 03, Hayward, CA (AFDC station 447469)”, https://chargecensus.com/stations/california/in-n-out-harder-03-447469 (data as of October 12, 2026).