Holiday Inn Ex EV Station 01
AvailableEV charging station in Livermore, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 159238.
At a glance
Holiday Inn Ex EV Station 01 is a public EV charging station at 3000 Constitution Dr in Livermore, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 159238 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3000 Constitution Dr
- City
- Livermore
- State
- California
- ZIP
- 94551
- Coordinates
- 37.70404, -121.81715
Within ~15 km
Nearby charging
Non-networked · Available
- Bishop Ranch66 ports
EV Connect · Available
Non-networked · Available
- Avalon West Dublin58 ports
Loop · Available
- Bishop Ranch39 ports
EV Connect · Available
- Gillig30 ports
PowerFlex · Available
What kind of charging does Holiday Inn Ex EV Station 01 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Holiday Inn Ex EV Station 01 compare with other stations in Livermore?
Livermore has 67 charging stations in the DOE registry with 441 ports. Holiday Inn Ex EV Station 01 accounts for under 1% of the charging ports in Livermore. ChargePoint runs 43 stations in Livermore. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Holiday Inn Ex EV Station 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Holiday Inn Ex EV Station 01 have?
Holiday Inn Ex EV Station 01 has 1 charging port: 1 Level 2.
Does Holiday Inn Ex EV Station 01 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Holiday Inn Ex EV Station 01 have?
Holiday Inn Ex EV Station 01 has J1772 connectors.
Is Holiday Inn Ex EV Station 01 open to the public?
Yes. Holiday Inn Ex EV Station 01 is listed with public access, and its status is available.
Where is Holiday Inn Ex EV Station 01?
Holiday Inn Ex EV Station 01 is at 3000 Constitution Dr, Livermore, CA 94551. Its coordinates are 37.70404, -121.81715.
More EV charging around Livermore
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 159238, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Holiday Inn Ex EV Station 01, Livermore, CA (AFDC station 159238)”, https://chargecensus.com/stations/california/holiday-inn-ex-ev-station-01-159238 (data as of October 12, 2026).