Hacienda Plaza Pleasanton
AvailableEV charging station in Pleasanton, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 158917.
At a glance
Hacienda Plaza Pleasanton is a public EV charging station at 5674 Stoneridge Dr in Pleasanton, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 158917 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5674 Stoneridge Dr
- City
- Pleasanton
- State
- California
- ZIP
- 94588
- Coordinates
- 37.69119, -121.88977
Within ~15 km
Nearby charging
- Bishop Ranch66 ports
EV Connect · Available
- Avalon West Dublin58 ports
Loop · Available
- Bishop Ranch39 ports
EV Connect · Available
- Gillig30 ports
PowerFlex · Available
- SCIF - Pleasanton30 ports
AmpUp · Available
- Bishop Ranch29 ports
EV Connect · Available
What kind of charging does Hacienda Plaza Pleasanton offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Hacienda Plaza Pleasanton compare with other stations in Pleasanton?
Pleasanton has 83 charging stations in the DOE registry with 289 ports. Hacienda Plaza Pleasanton accounts for under 1% of the charging ports in Pleasanton. ChargePoint runs 59 stations in Pleasanton. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Hacienda Plaza Pleasanton?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hacienda Plaza Pleasanton have?
Hacienda Plaza Pleasanton has 2 charging ports: 2 Level 2.
Does Hacienda Plaza Pleasanton have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Hacienda Plaza Pleasanton have?
Hacienda Plaza Pleasanton has J1772 connectors.
Is Hacienda Plaza Pleasanton open to the public?
Yes. Hacienda Plaza Pleasanton is listed with public access, and its status is available.
Where is Hacienda Plaza Pleasanton?
Hacienda Plaza Pleasanton is at 5674 Stoneridge Dr, Pleasanton, CA 94588. Its coordinates are 37.69119, -121.88977.
More EV charging around Pleasanton
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 158917, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hacienda Plaza Pleasanton, Pleasanton, CA (AFDC station 158917)”, https://chargecensus.com/stations/california/hacienda-plaza-pleasanton-158917 (data as of October 12, 2026).