Gridley Country Ford
AvailableEV charging station in Gridley, California on the Ford Charge network — 2 DC fast. US DOE AFDC station 416827.
At a glance
Gridley Country Ford is a public EV charging station at 1709 CA-99 in Gridley, California, on the Ford Charge network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Feb 27, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 416827 |
| Network | Ford Charge |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Feb 27, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1709 CA-99
- City
- Gridley
- State
- California
- ZIP
- 95948
- Coordinates
- 39.36734, -121.68878
Within ~15 km
Nearby charging
- Holiday Inn Express Oroville9 ports
EVCS · Available
Tesla Destination · Available
Tesla Supercharger · Available
ChargePoint · Available
What kind of charging does Gridley Country Ford offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.
How does Gridley Country Ford compare with other stations in Gridley?
Gridley has 1 charging station in the DOE registry with 2 ports. It is the only Ford Charge station in Gridley. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Gridley Country Ford?
Ford Charge operates 357 stations in the registry across 46 states, with 1,288 DC fast and 2 Level 2 ports in total. 7 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 27, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gridley Country Ford have?
Gridley Country Ford has 2 charging ports: 2 DC fast.
Does Gridley Country Ford have DC fast charging?
Yes. The registry lists 2 DC fast ports at Gridley Country Ford, with CCS connectors.
What connectors does Gridley Country Ford have?
Gridley Country Ford has CCS connectors.
Is Gridley Country Ford open to the public?
Yes. Gridley Country Ford is listed with public access, and its status is available.
Where is Gridley Country Ford?
Gridley Country Ford is at 1709 CA-99, Gridley, CA 95948. Its coordinates are 39.36734, -121.68878.
More EV charging around Gridley
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 416827, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gridley Country Ford, Gridley, CA (AFDC station 416827)”, https://chargecensus.com/stations/california/gridley-country-ford-416827 (data as of October 12, 2026).