Goleta Water EV Station 01
AvailableEV charging station in Santa Barbara, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 159480.
At a glance
Goleta Water EV Station 01 is a public EV charging station at 4699 Hollister Ave in Santa Barbara, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 159480 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4699 Hollister Ave
- City
- Santa Barbara
- State
- California
- ZIP
- 93110
- Coordinates
- 34.43669, -119.78440
Within ~15 km
Nearby charging
Electrify America · Available
- Bacara Resort & Spa19 ports
Blink · Available
- Goleta City Hall17 ports
PowerFlex · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Goleta, CA - Tesla Supercharger12 ports
Tesla Supercharger · Available
What kind of charging does Goleta Water EV Station 01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Goleta Water EV Station 01 compare with other stations in Santa Barbara?
Santa Barbara has 112 charging stations in the DOE registry with 326 ports. Goleta Water EV Station 01 accounts for under 1% of the charging ports in Santa Barbara. ChargePoint runs 76 stations in Santa Barbara. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Goleta Water EV Station 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Goleta Water EV Station 01 have?
Goleta Water EV Station 01 has 2 charging ports: 2 Level 2.
Does Goleta Water EV Station 01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Goleta Water EV Station 01 have?
Goleta Water EV Station 01 has J1772 connectors.
Is Goleta Water EV Station 01 open to the public?
Yes. Goleta Water EV Station 01 is listed with public access, and its status is available.
Where is Goleta Water EV Station 01?
Goleta Water EV Station 01 is at 4699 Hollister Ave, Santa Barbara, CA 93110. Its coordinates are 34.43669, -119.78440.
More EV charging around Santa Barbara
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 159480, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Goleta Water EV Station 01, Santa Barbara, CA (AFDC station 159480)”, https://chargecensus.com/stations/california/goleta-water-ev-station-01-159480 (data as of October 12, 2026).