Goleta Water District
AvailableEV charging station in Santa Barbara, California on the Turnongreen network — 6 Level 2. US DOE AFDC station 450848.
At a glance
Goleta Water District is a public EV charging station at 4699 Hollister Ave in Santa Barbara, California, on the Turnongreen network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 1, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 450848 |
| Network | Turnongreen |
| Status | Available (E) |
| Access | Public |
| Facility | Fleet garage |
| Open date | Sep 1, 2024 |
| Last updated at source | Mar 19, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4699 Hollister Ave
- City
- Santa Barbara
- State
- California
- ZIP
- 93110
- Coordinates
- 34.43705, -119.78497
Within ~15 km
Nearby charging
Electrify America · Available
- Bacara Resort & Spa19 ports
Blink · Available
- Goleta City Hall17 ports
PowerFlex · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Goleta, CA - Tesla Supercharger12 ports
Tesla Supercharger · Available
What kind of charging does Goleta Water District offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 60% above the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a fleet garage location.
How does Goleta Water District compare with other stations in Santa Barbara?
Santa Barbara has 112 charging stations in the DOE registry with 326 ports. Goleta Water District accounts for 2% of the charging ports in Santa Barbara. Turnongreen runs 3 stations in Santa Barbara. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Goleta Water District?
Turnongreen operates 150 stations in the registry across 34 states, with 16 DC fast and 458 Level 2 ports in total. 41 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 1, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Mar 19, 2026.
Frequently asked questions
How many chargers does Goleta Water District have?
Goleta Water District has 6 charging ports: 6 Level 2.
Does Goleta Water District have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does Goleta Water District have?
Goleta Water District has J1772 connectors.
Is Goleta Water District open to the public?
Yes. Goleta Water District is listed with public access, and its status is available.
Where is Goleta Water District?
Goleta Water District is at 4699 Hollister Ave, Santa Barbara, CA 93110. Its coordinates are 34.43705, -119.78497.
More EV charging around Santa Barbara
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 450848, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Goleta Water District, Santa Barbara, CA (AFDC station 450848)”, https://chargecensus.com/stations/california/goleta-water-district-450848 (data as of October 12, 2026).