Goleta Estorage EV Charger 1
AvailableEV charging station in Goleta, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 323058.
At a glance
Goleta Estorage EV Charger 1 is a public EV charging station at 6864 Cortona Dr in Goleta, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 20, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 323058 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 20, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 6864 Cortona Dr
- City
- Goleta
- State
- California
- ZIP
- 93117
- Coordinates
- 34.43235, -119.86923
Within ~15 km
Nearby charging
- Bacara Resort & Spa19 ports
Blink · Available
- Goleta City Hall17 ports
PowerFlex · Available
Tesla Supercharger · Available
- Goleta, CA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Goleta Water District10 ports
Turnongreen · Available
PowerFlex · Available
What kind of charging does Goleta Estorage EV Charger 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Goleta Estorage EV Charger 1 compare with other stations in Goleta?
Goleta has 36 charging stations in the DOE registry with 91 ports. Goleta Estorage EV Charger 1 accounts for 1% of the charging ports in Goleta. ChargePoint runs 28 stations in Goleta. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Goleta Estorage EV Charger 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 20, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Goleta Estorage EV Charger 1 have?
Goleta Estorage EV Charger 1 has 1 charging port: 1 Level 2.
Does Goleta Estorage EV Charger 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Goleta Estorage EV Charger 1 have?
Goleta Estorage EV Charger 1 has J1772 connectors.
Is Goleta Estorage EV Charger 1 open to the public?
Yes. Goleta Estorage EV Charger 1 is listed with public access, and its status is available.
Where is Goleta Estorage EV Charger 1?
Goleta Estorage EV Charger 1 is at 6864 Cortona Dr, Goleta, CA 93117. Its coordinates are 34.43235, -119.86923.
More EV charging around Goleta
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 323058, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Goleta Estorage EV Charger 1, Goleta, CA (AFDC station 323058)”, https://chargecensus.com/stations/california/goleta-estorage-ev-charger-1-323058 (data as of October 12, 2026).