Gibson Building A
Temporarily unavailableEV charging station in Santa Monica, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 376336.
At a glance
Gibson Building A is a public EV charging station at 1313 7th St in Santa Monica, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Jan 28, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 376336 |
| Network | ChargePoint |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Jan 28, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1313 7th St
- City
- Santa Monica
- State
- California
- ZIP
- 90401
- Coordinates
- 34.01987, -118.49320
Within ~15 km
Nearby charging
Tesla Destination · Available
- Century Park Parking SW & NW79 ports
AmpUp · Available
Tesla Supercharger · Available
- The Thomas Apartments59 ports
Loop · Available
Tesla Destination · Available
- Westin Los Angeles Airport50 ports
Autel · Available
What kind of charging does Gibson Building A offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Gibson Building A compare with other stations in Santa Monica?
Santa Monica has 258 charging stations in the DOE registry with 789 ports, the 11th-most of 812 cities and towns in California. Gibson Building A accounts for under 1% of the charging ports in Santa Monica. ChargePoint runs 193 stations in Santa Monica. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Gibson Building A?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 28, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gibson Building A have?
Gibson Building A has 2 charging ports: 2 Level 2.
Does Gibson Building A have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Gibson Building A have?
Gibson Building A has J1772 connectors.
Is Gibson Building A open to the public?
Yes. Gibson Building A is listed with public access, and its status is temporarily unavailable.
Where is Gibson Building A?
Gibson Building A is at 1313 7th St, Santa Monica, CA 90401. Its coordinates are 34.01987, -118.49320.
More EV charging around Santa Monica
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 376336, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gibson Building A, Santa Monica, CA (AFDC station 376336)”, https://chargecensus.com/stations/california/gibson-building-a-376336 (data as of October 12, 2026).