ChargeCensus

Gf4eva Bear River Dc1

Available

EV charging station in Loleta, California on the ChargePoint network — 1 DC fast. US DOE AFDC station 199177.

At a glance

Gf4eva Bear River Dc1 is a public EV charging station at 260 Keisner in Loleta, California, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 27, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID199177
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
260 Keisner
City
Loleta
ZIP
95551
Coordinates
40.62677, -124.21070

Within ~15 km

Nearby charging

What kind of charging does Gf4eva Bear River Dc1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Gf4eva Bear River Dc1 compare with other stations in Loleta?

Loleta has 4 charging stations in the DOE registry with 6 ports. Gf4eva Bear River Dc1 accounts for 17% of the charging ports in Loleta. ChargePoint runs 3 stations in Loleta. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Gf4eva Bear River Dc1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 27, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Gf4eva Bear River Dc1 have?

Gf4eva Bear River Dc1 has 1 charging port: 1 DC fast.

Does Gf4eva Bear River Dc1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Gf4eva Bear River Dc1, with CHAdeMO and CCS connectors.

What connectors does Gf4eva Bear River Dc1 have?

Gf4eva Bear River Dc1 has CHAdeMO and CCS connectors.

Is Gf4eva Bear River Dc1 open to the public?

Yes. Gf4eva Bear River Dc1 is listed with public access, and its status is available.

Where is Gf4eva Bear River Dc1?

Gf4eva Bear River Dc1 is at 260 Keisner, Loleta, CA 95551. Its coordinates are 40.62677, -124.21070.

More EV charging around Loleta

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 199177, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Gf4eva Bear River Dc1, Loleta, CA (AFDC station 199177)”, https://chargecensus.com/stations/california/gf4eva-bear-river-dc1-199177 (data as of October 12, 2026).