ChargeCensus

Gateway Oaks Metro Center

Available

EV charging station in Sacramento, California, not on a charging network — 1 Level 2. US DOE AFDC station 204266.

At a glance

Gateway Oaks Metro Center is a public EV charging station at 2710 Gateway Oaks Dr in Sacramento, California, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 7, 2017.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID204266
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityOffice building
Open dateFeb 7, 2017
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
2710 Gateway Oaks Dr
ZIP
95833
Coordinates
38.61547, -121.51726

Within ~15 km

Nearby charging

What kind of charging does Gateway Oaks Metro Center offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a office building location.

How does Gateway Oaks Metro Center compare with other stations in Sacramento?

Sacramento has 535 charging stations in the DOE registry with 2,082 ports, the 6th-most of 812 cities and towns in California. Gateway Oaks Metro Center accounts for under 1% of the charging ports in Sacramento. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Gateway Oaks Metro Center?

Gateway Oaks Metro Center is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 7, 2017, one of 178 stations in California with a 2017 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Gateway Oaks Metro Center have?

Gateway Oaks Metro Center has 1 charging port: 1 Level 2.

Does Gateway Oaks Metro Center have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Gateway Oaks Metro Center have?

Gateway Oaks Metro Center has J1772 connectors.

Is charging at Gateway Oaks Metro Center free?

Pricing as reported to the DOE registry: Free.

Is Gateway Oaks Metro Center open to the public?

Yes. Gateway Oaks Metro Center is listed with public access, and its status is available.

Where is Gateway Oaks Metro Center?

Gateway Oaks Metro Center is at 2710 Gateway Oaks Dr, Sacramento, CA 95833. Its coordinates are 38.61547, -121.51726.

More EV charging around Sacramento

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 204266, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Gateway Oaks Metro Center, Sacramento, CA (AFDC station 204266)”, https://chargecensus.com/stations/california/gateway-oaks-metro-center-204266 (data as of October 12, 2026).