ChargeCensus

Full Charge Cpf50 3

Available

EV charging station in Huntington Beach, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 428524.

At a glance

Full Charge Cpf50 3 is a public EV charging station at 18881 Beach Blvd in Huntington Beach, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 2, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID428524
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 2, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
18881 Beach Blvd
ZIP
92648
Coordinates
33.68749, -117.98946

Within ~15 km

Nearby charging

What kind of charging does Full Charge Cpf50 3 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Full Charge Cpf50 3 compare with other stations in Huntington Beach?

Huntington Beach has 48 charging stations in the DOE registry with 179 ports. Full Charge Cpf50 3 accounts for under 1% of the charging ports in Huntington Beach. ChargePoint runs 27 stations in Huntington Beach. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Full Charge Cpf50 3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 2, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Full Charge Cpf50 3 have?

Full Charge Cpf50 3 has 1 charging port: 1 Level 2.

Does Full Charge Cpf50 3 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Full Charge Cpf50 3 have?

Full Charge Cpf50 3 has J1772 connectors.

Is Full Charge Cpf50 3 open to the public?

Yes. Full Charge Cpf50 3 is listed with public access, and its status is available.

Where is Full Charge Cpf50 3?

Full Charge Cpf50 3 is at 18881 Beach Blvd, Huntington Beach, CA 92648. Its coordinates are 33.68749, -117.98946.

More EV charging around Huntington Beach

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 428524, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Full Charge Cpf50 3, Huntington Beach, CA (AFDC station 428524)”, https://chargecensus.com/stations/california/full-charge-cpf50-3-428524 (data as of October 12, 2026).