Fremont EV Leviton 1
AvailableEV charging station in Fremont, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 206104.
At a glance
Fremont EV Leviton 1 is a public EV charging station at 3500 Capitol Ave. in Fremont, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 10, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 206104 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 10, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3500 Capitol Ave.
- City
- Fremont
- State
- California
- ZIP
- 94538
- Coordinates
- 37.55025, -121.98354
Within ~15 km
Nearby charging
What kind of charging does Fremont EV Leviton 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Fremont EV Leviton 1 compare with other stations in Fremont?
Fremont has 133 charging stations in the DOE registry with 487 ports. Fremont EV Leviton 1 accounts for under 1% of the charging ports in Fremont. ChargePoint runs 94 stations in Fremont. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Fremont EV Leviton 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 10, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Fremont EV Leviton 1 have?
Fremont EV Leviton 1 has 2 charging ports: 2 Level 2.
Does Fremont EV Leviton 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Fremont EV Leviton 1 have?
Fremont EV Leviton 1 has J1772 connectors.
Is Fremont EV Leviton 1 open to the public?
Yes. Fremont EV Leviton 1 is listed with public access, and its status is available.
Where is Fremont EV Leviton 1?
Fremont EV Leviton 1 is at 3500 Capitol Ave., Fremont, CA 94538. Its coordinates are 37.55025, -121.98354.
More EV charging around Fremont
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 206104, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Fremont EV Leviton 1, Fremont, CA (AFDC station 206104)”, https://chargecensus.com/stations/california/fremont-ev-leviton-1-206104 (data as of October 12, 2026).