ChargeCensus

Fallon Sports Park 1

Available

EV charging station in Dublin, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 237828.

At a glance

Fallon Sports Park 1 is a public EV charging station at 4605 Lockhart St in Dublin, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 21, 2017.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID237828
NetworkChargePoint
StatusAvailable (E)
AccessPublic
FacilityRec Sports Facility
Open dateDec 21, 2017
Last updated at sourceSep 14, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.30 per kWh

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
4605 Lockhart St
City
Dublin
ZIP
94568
Coordinates
37.71040, -121.85420

Within ~15 km

Nearby charging

What kind of charging does Fallon Sports Park 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.30 per kWh”. The site is listed as a rec sports facility location.

How does Fallon Sports Park 1 compare with other stations in Dublin?

Dublin has 77 charging stations in the DOE registry with 291 ports. Fallon Sports Park 1 accounts for under 1% of the charging ports in Dublin. ChargePoint runs 53 stations in Dublin. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Fallon Sports Park 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 21, 2017, one of 178 stations in California with a 2017 open date. The station's record was last updated at the source on Sep 14, 2026.

Frequently asked questions

How many chargers does Fallon Sports Park 1 have?

Fallon Sports Park 1 has 2 charging ports: 2 Level 2.

Does Fallon Sports Park 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Fallon Sports Park 1 have?

Fallon Sports Park 1 has J1772 connectors.

Is charging at Fallon Sports Park 1 free?

Pricing as reported to the DOE registry: $0.30 per kWh.

Is Fallon Sports Park 1 open to the public?

Yes. Fallon Sports Park 1 is listed with public access, and its status is available.

Where is Fallon Sports Park 1?

Fallon Sports Park 1 is at 4605 Lockhart St, Dublin, CA 94568. Its coordinates are 37.71040, -121.85420.

More EV charging around Dublin

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 237828, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fallon Sports Park 1, Dublin, CA (AFDC station 237828)”, https://chargecensus.com/stations/california/fallon-sports-park-1-237828 (data as of October 12, 2026).