ChargeCensus

Fairfield Civic Center Lot A

Available

EV charging station in Fairfield, California on the EVCS network — 6 DC fast. US DOE AFDC station 397527.

At a glance

Fairfield Civic Center Lot A is a public EV charging station at 1000 Webster Street in Fairfield, California, on the EVCS network. It has 6 charging ports (6 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 2, 2025.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID397527
NetworkEVCS
StatusAvailable (E)
AccessPublic
Open dateJun 2, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVCS

Operates 277 stations in the DOE registry — view the full network →

Location

Address
1000 Webster Street
ZIP
94533
Coordinates
38.25233, -122.04467

Within ~15 km

Nearby charging

What kind of charging does Fairfield Civic Center Lot A offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% above the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Fairfield Civic Center Lot A compare with other stations in Fairfield?

Fairfield has 59 charging stations in the DOE registry with 270 ports. Fairfield Civic Center Lot A accounts for 2% of the charging ports in Fairfield. EVCS runs 6 stations in Fairfield. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Fairfield Civic Center Lot A?

EVCS operates 277 stations in the registry across 3 states, with 890 DC fast and 705 Level 2 ports in total. 200 of those stations are in California, under 1% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 2, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Fairfield Civic Center Lot A have?

Fairfield Civic Center Lot A has 6 charging ports: 6 DC fast.

Does Fairfield Civic Center Lot A have DC fast charging?

Yes. The registry lists 6 DC fast ports at Fairfield Civic Center Lot A, with CHAdeMO and CCS connectors.

What connectors does Fairfield Civic Center Lot A have?

Fairfield Civic Center Lot A has CHAdeMO and CCS connectors.

Is Fairfield Civic Center Lot A open to the public?

Yes. Fairfield Civic Center Lot A is listed with public access, and its status is available.

Where is Fairfield Civic Center Lot A?

Fairfield Civic Center Lot A is at 1000 Webster Street, Fairfield, CA 94533. Its coordinates are 38.25233, -122.04467.

More EV charging around Fairfield

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 397527, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fairfield Civic Center Lot A, Fairfield, CA (AFDC station 397527)”, https://chargecensus.com/stations/california/fairfield-civic-center-lot-a-397527 (data as of October 12, 2026).