EZ Trip Plaza
AvailableEV charging station in Buttonwillow, California, not on a charging network — 6 DC fast. US DOE AFDC station 418073.
At a glance
EZ Trip Plaza is a public EV charging station at 20662 Tracey Ave in Buttonwillow, California, not attached to a charging network. It has 6 charging ports (6 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 15, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 418073 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Gas station |
| Open date | Aug 15, 2025 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: $0.70 per kWh
Location
- Address
- 20662 Tracey Ave
- City
- Buttonwillow
- State
- California
- ZIP
- 93206
- Coordinates
- 35.40171, -119.39767
Within ~15 km
Nearby charging
- OMS Shafter13 ports
Loop · Available
Tesla Supercharger · Available
- Frito-Lay Kern12 ports
Autel · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Buttonwillow, CA9 ports
Rivian Adventure Network · Available
What kind of charging does EZ Trip Plaza offer?
Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% above the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector. Pricing as reported to the registry: “$0.70 per kWh”. The site is listed as a gas station location.
How does EZ Trip Plaza compare with other stations in Buttonwillow?
Buttonwillow has 8 charging stations in the DOE registry with 46 ports. EZ Trip Plaza accounts for 13% of the charging ports in Buttonwillow. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates EZ Trip Plaza?
EZ Trip Plaza is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does EZ Trip Plaza have?
EZ Trip Plaza has 6 charging ports: 6 DC fast.
Does EZ Trip Plaza have DC fast charging?
Yes. The registry lists 6 DC fast ports at EZ Trip Plaza, with CHAdeMO and CCS connectors.
What connectors does EZ Trip Plaza have?
EZ Trip Plaza has CHAdeMO and CCS connectors.
Is charging at EZ Trip Plaza free?
Pricing as reported to the DOE registry: $0.70 per kWh.
Is EZ Trip Plaza open to the public?
Yes. EZ Trip Plaza is listed with public access, and its status is available.
Where is EZ Trip Plaza?
EZ Trip Plaza is at 20662 Tracey Ave, Buttonwillow, CA 93206. Its coordinates are 35.40171, -119.39767.
More EV charging around Buttonwillow
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 418073, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “EZ Trip Plaza, Buttonwillow, CA (AFDC station 418073)”, https://chargecensus.com/stations/california/ez-trip-plaza-418073 (data as of October 12, 2026).