Evrgrn Circle Building S5
AvailableEV charging station in San Jose, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 458294.
At a glance
Evrgrn Circle Building S5 is a public EV charging station at 2382 Evergreen Pl in San Jose, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 28, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458294 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 28, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2382 Evergreen Pl
- City
- San Jose
- State
- California
- ZIP
- 95122
- Coordinates
- 37.31946, -121.80965
Within ~15 km
Nearby charging
- Google249 ports
ChargePoint · Available
Blink · Available
- Google96 ports
ChargePoint · Available
- Branham High School50 ports
PowerFlex · Available
- Leigh High School48 ports
PowerFlex · Available
Tesla Supercharger · Available
What kind of charging does Evrgrn Circle Building S5 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Evrgrn Circle Building S5 compare with other stations in San Jose?
San Jose has 692 charging stations in the DOE registry with 2,899 ports, the 4th-most of 812 cities and towns in California. Evrgrn Circle Building S5 accounts for under 1% of the charging ports in San Jose. ChargePoint runs 552 stations in San Jose. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Evrgrn Circle Building S5?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 28, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Evrgrn Circle Building S5 have?
Evrgrn Circle Building S5 has 2 charging ports: 2 Level 2.
Does Evrgrn Circle Building S5 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Evrgrn Circle Building S5 have?
Evrgrn Circle Building S5 has J1772 connectors.
Is Evrgrn Circle Building S5 open to the public?
Yes. Evrgrn Circle Building S5 is listed with public access, and its status is available.
Where is Evrgrn Circle Building S5?
Evrgrn Circle Building S5 is at 2382 Evergreen Pl, San Jose, CA 95122. Its coordinates are 37.31946, -121.80965.
More EV charging around San Jose
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458294, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Evrgrn Circle Building S5, San Jose, CA (AFDC station 458294)”, https://chargecensus.com/stations/california/evrgrn-circle-building-s5-458294 (data as of October 12, 2026).