ChargeCensus

Ethan Conrad #48

Available

EV charging station in Sacramento, California on the EVgo network — 14 DC fast. US DOE AFDC station 451723.

At a glance

Ethan Conrad #48 is a public EV charging station at 8341 Folsom Blvd. in Sacramento, California, on the EVgo network. It has 14 charging ports (14 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Feb 21, 2026.

Total ports
14
DC fast
14
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID451723
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateFeb 21, 2026
Last updated at sourceOct 11, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
8341 Folsom Blvd.
ZIP
95826
Coordinates
38.54753, -121.39691

Within ~15 km

Nearby charging

What kind of charging does Ethan Conrad #48 offer?

Of its 14 ports, 14 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 3.7 times the California average of 3.7 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.

How does Ethan Conrad #48 compare with other stations in Sacramento?

Sacramento has 535 charging stations in the DOE registry with 2,082 ports, the 6th-most of 812 cities and towns in California. Ethan Conrad #48 accounts for under 1% of the charging ports in Sacramento. EVgo runs 16 stations in Sacramento. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Ethan Conrad #48?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814. By port count this is the 11th-biggest EVgo station in the country.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 21, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 11, 2026.

Frequently asked questions

How many chargers does Ethan Conrad #48 have?

Ethan Conrad #48 has 14 charging ports: 14 DC fast.

Does Ethan Conrad #48 have DC fast charging?

Yes. The registry lists 14 DC fast ports at Ethan Conrad #48, with CCS and NACS (Tesla) connectors.

What connectors does Ethan Conrad #48 have?

Ethan Conrad #48 has CCS and NACS (Tesla) connectors.

Is Ethan Conrad #48 open to the public?

Yes. Ethan Conrad #48 is listed with public access, and its status is available.

Where is Ethan Conrad #48?

Ethan Conrad #48 is at 8341 Folsom Blvd., Sacramento, CA 95826. Its coordinates are 38.54753, -121.39691.

More EV charging around Sacramento

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 451723, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ethan Conrad #48, Sacramento, CA (AFDC station 451723)”, https://chargecensus.com/stations/california/ethan-conrad-48-451723 (data as of October 12, 2026).