El Segundo Starbucks #2
AvailableEV charging station in El Segundo, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 387027.
At a glance
El Segundo Starbucks #2 is a public EV charging station at 2120 East El Segundo Boulevard in El Segundo, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 28, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 387027 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 28, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2120 East El Segundo Boulevard
- City
- El Segundo
- State
- California
- ZIP
- 90245
- Coordinates
- 33.91598, -118.39051
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
Non-networked · Available
Tesla Destination · Available
- Century Park Parking SW & NW79 ports
AmpUp · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
Tesla Supercharger · Available
What kind of charging does El Segundo Starbucks #2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does El Segundo Starbucks #2 compare with other stations in El Segundo?
El Segundo has 68 charging stations in the DOE registry with 213 ports. El Segundo Starbucks #2 accounts for under 1% of the charging ports in El Segundo. ChargePoint runs 48 stations in El Segundo. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates El Segundo Starbucks #2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 28, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does El Segundo Starbucks #2 have?
El Segundo Starbucks #2 has 2 charging ports: 2 Level 2.
Does El Segundo Starbucks #2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does El Segundo Starbucks #2 have?
El Segundo Starbucks #2 has J1772 connectors.
Is El Segundo Starbucks #2 open to the public?
Yes. El Segundo Starbucks #2 is listed with public access, and its status is available.
Where is El Segundo Starbucks #2?
El Segundo Starbucks #2 is at 2120 East El Segundo Boulevard, El Segundo, CA 90245. Its coordinates are 33.91598, -118.39051.
More EV charging around El Segundo
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 387027, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “El Segundo Starbucks #2, El Segundo, CA (AFDC station 387027)”, https://chargecensus.com/stations/california/el-segundo-starbucks-2-387027 (data as of October 12, 2026).