ChargeCensus

Edition Future Resident

Available

EV charging station in Irvine, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 330694.

At a glance

Edition Future Resident is a public EV charging station at 1204 Steely in Irvine, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 17, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID330694
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 17, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1204 Steely
City
Irvine
ZIP
92614
Coordinates
33.69327, -117.84013

Within ~15 km

Nearby charging

What kind of charging does Edition Future Resident offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Edition Future Resident compare with other stations in Irvine?

Irvine has 812 charging stations in the DOE registry with 1,938 ports, the 3rd-most of 812 cities and towns in California. Edition Future Resident accounts for under 1% of the charging ports in Irvine. ChargePoint runs 752 stations in Irvine. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Edition Future Resident?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 17, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Edition Future Resident have?

Edition Future Resident has 2 charging ports: 2 Level 2.

Does Edition Future Resident have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Edition Future Resident have?

Edition Future Resident has J1772 connectors.

Is Edition Future Resident open to the public?

Yes. Edition Future Resident is listed with public access, and its status is available.

Where is Edition Future Resident?

Edition Future Resident is at 1204 Steely, Irvine, CA 92614. Its coordinates are 33.69327, -117.84013.

More EV charging around Irvine

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 330694, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Edition Future Resident, Irvine, CA (AFDC station 330694)”, https://chargecensus.com/stations/california/edition-future-resident-330694 (data as of October 12, 2026).