ChargeCensus

Dc Gt Dc1

Available

EV charging station in Grand Terrace, California on the ChargePoint network — 1 DC fast. US DOE AFDC station 174955.

At a glance

Dc Gt Dc1 is a public EV charging station at 22795 Barton Rd in Grand Terrace, California, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID174955
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
22795 Barton Rd
City
Grand Terrace
ZIP
92313
Coordinates
34.03496, -117.30691

Within ~15 km

Nearby charging

What kind of charging does Dc Gt Dc1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Dc Gt Dc1 compare with other stations in Grand Terrace?

Grand Terrace has 5 charging stations in the DOE registry with 38 ports. Dc Gt Dc1 accounts for 3% of the charging ports in Grand Terrace. ChargePoint runs 3 stations in Grand Terrace. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Dc Gt Dc1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dc Gt Dc1 have?

Dc Gt Dc1 has 1 charging port: 1 DC fast.

Does Dc Gt Dc1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Dc Gt Dc1, with CHAdeMO and CCS connectors.

What connectors does Dc Gt Dc1 have?

Dc Gt Dc1 has CHAdeMO and CCS connectors.

Is Dc Gt Dc1 open to the public?

Yes. Dc Gt Dc1 is listed with public access, and its status is available.

Where is Dc Gt Dc1?

Dc Gt Dc1 is at 22795 Barton Rd, Grand Terrace, CA 92313. Its coordinates are 34.03496, -117.30691.

More EV charging around Grand Terrace

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 174955, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Dc Gt Dc1, Grand Terrace, CA (AFDC station 174955)”, https://chargecensus.com/stations/california/dc-gt-dc1-174955 (data as of October 12, 2026).