Cupertino Electric
AvailableEV charging station in San Jose, California, not on a charging network — 12 Level 2. US DOE AFDC station 46482.
At a glance
Cupertino Electric is a public EV charging station at 1132 N 7th St in San Jose, California, not attached to a charging network. It has 12 charging ports (12 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 23, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 46482 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Utility |
| Open date | Jan 23, 2019 |
| Last updated at source | May 27, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 1132 N 7th St
- City
- San Jose
- State
- California
- ZIP
- 95112
- Coordinates
- 37.36218, -121.89954
Within ~15 km
Nearby charging
- Google249 ports
ChargePoint · Available
Blink · Available
- Google96 ports
ChargePoint · Available
- Google83 ports
ChargePoint · Available
- 23andMe - Headquarters73 ports
PowerFlex · Available
- Google63 ports
ChargePoint · Available
What kind of charging does Cupertino Electric offer?
Of its 12 ports, 12 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.2 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a utility location.
How does Cupertino Electric compare with other stations in San Jose?
San Jose has 692 charging stations in the DOE registry with 2,899 ports, the 4th-most of 812 cities and towns in California. Cupertino Electric accounts for under 1% of the charging ports in San Jose. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Cupertino Electric?
Cupertino Electric is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 23, 2019, one of 423 stations in California with a 2019 open date. The station's record was last updated at the source on May 27, 2025.
Frequently asked questions
How many chargers does Cupertino Electric have?
Cupertino Electric has 12 charging ports: 12 Level 2.
Does Cupertino Electric have DC fast charging?
No. The registry lists no DC fast ports here; its 12 ports are all Level 2.
What connectors does Cupertino Electric have?
Cupertino Electric has J1772 connectors.
Is charging at Cupertino Electric free?
Pricing as reported to the DOE registry: Free.
Is Cupertino Electric open to the public?
Yes. Cupertino Electric is listed with public access, and its status is available.
Where is Cupertino Electric?
Cupertino Electric is at 1132 N 7th St, San Jose, CA 95112. Its coordinates are 37.36218, -121.89954.
More EV charging around San Jose
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 46482, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cupertino Electric, San Jose, CA (AFDC station 46482)”, https://chargecensus.com/stations/california/cupertino-electric-46482 (data as of October 12, 2026).