Cu Killefer 3
AvailableEV charging station in Orange, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 383814.
At a glance
Cu Killefer 3 is a public EV charging station at 541 North Lemon Street in Orange, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 8, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 383814 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 8, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 541 North Lemon Street
- City
- Orange
- State
- California
- ZIP
- 92867
- Coordinates
- 33.79621, -117.85476
Within ~15 km
Nearby charging
- Orange Ca Sdc98 ports
Non-networked · Available
- 2390 Red Hills Ave87 ports
Chargie · Available
- Irvine Ca Sdc76 ports
Non-networked · Available
- Great Park Lot 570 ports
Noodoe · Available
- Mercury Insurance - Brea66 ports
PowerFlex · Available
- 2300 Red Hills Ave58 ports
Chargie · Available
What kind of charging does Cu Killefer 3 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cu Killefer 3 compare with other stations in Orange?
Orange has 148 charging stations in the DOE registry with 422 ports, the 22nd-most of 812 cities and towns in California. Cu Killefer 3 accounts for under 1% of the charging ports in Orange. ChargePoint runs 131 stations in Orange. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Cu Killefer 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 8, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cu Killefer 3 have?
Cu Killefer 3 has 1 charging port: 1 Level 2.
Does Cu Killefer 3 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Cu Killefer 3 have?
Cu Killefer 3 has J1772 connectors.
Is Cu Killefer 3 open to the public?
Yes. Cu Killefer 3 is listed with public access, and its status is available.
Where is Cu Killefer 3?
Cu Killefer 3 is at 541 North Lemon Street, Orange, CA 92867. Its coordinates are 33.79621, -117.85476.
More EV charging around Orange
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 383814, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cu Killefer 3, Orange, CA (AFDC station 383814)”, https://chargecensus.com/stations/california/cu-killefer-3-383814 (data as of October 12, 2026).