Csu Fullerton R1 - 07
AvailableEV charging station in Fullerton, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 233435.
At a glance
Csu Fullerton R1 - 07 is a public EV charging station at 800 N. State College Blvd. in Fullerton, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 14, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 233435 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 14, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 800 N. State College Blvd.
- City
- Fullerton
- State
- California
- ZIP
- 92831
- Coordinates
- 33.88231, -117.88146
Within ~15 km
Nearby charging
- Orange Ca Sdc98 ports
Non-networked · Available
- Mercury Insurance - Brea66 ports
PowerFlex · Available
- Batavia Gardens apartment32 ports
evGateway · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Csu Fullerton R1 - 07 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Csu Fullerton R1 - 07 compare with other stations in Fullerton?
Fullerton has 132 charging stations in the DOE registry with 282 ports. Csu Fullerton R1 - 07 accounts for under 1% of the charging ports in Fullerton. ChargePoint runs 121 stations in Fullerton. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Csu Fullerton R1 - 07?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 14, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Csu Fullerton R1 - 07 have?
Csu Fullerton R1 - 07 has 1 charging port: 1 Level 2.
Does Csu Fullerton R1 - 07 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Csu Fullerton R1 - 07 have?
Csu Fullerton R1 - 07 has J1772 connectors.
Is Csu Fullerton R1 - 07 open to the public?
Yes. Csu Fullerton R1 - 07 is listed with public access, and its status is available.
Where is Csu Fullerton R1 - 07?
Csu Fullerton R1 - 07 is at 800 N. State College Blvd., Fullerton, CA 92831. Its coordinates are 33.88231, -117.88146.
More EV charging around Fullerton
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 233435, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Csu Fullerton R1 - 07, Fullerton, CA (AFDC station 233435)”, https://chargecensus.com/stations/california/csu-fullerton-r1-07-233435 (data as of October 12, 2026).