Cntyofriverside San Jac An1
AvailableEV charging station in San Jacinto, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 160636.
At a glance
Cntyofriverside San Jac An1 is a public EV charging station at 581 S Grand Ave in San Jacinto, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 160636 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 581 S Grand Ave
- City
- San Jacinto
- State
- California
- ZIP
- 92582
- Coordinates
- 33.78237, -116.97698
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- KRB7 Amazon6 ports
Blink · Available
- Banning City Hall4 ports
EV Connect · Available
- City of Hemet - City Hall4 ports
Non-networked · Available
- Intelsat4 ports
AmpUp · Available
EVCS · Available
What kind of charging does Cntyofriverside San Jac An1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cntyofriverside San Jac An1 compare with other stations in San Jacinto?
San Jacinto has 2 charging stations in the DOE registry with 4 ports. Cntyofriverside San Jac An1 accounts for 50% of the charging ports in San Jacinto. ChargePoint runs 2 stations in San Jacinto. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Cntyofriverside San Jac An1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cntyofriverside San Jac An1 have?
Cntyofriverside San Jac An1 has 2 charging ports: 2 Level 2.
Does Cntyofriverside San Jac An1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cntyofriverside San Jac An1 have?
Cntyofriverside San Jac An1 has J1772 connectors.
Is Cntyofriverside San Jac An1 open to the public?
Yes. Cntyofriverside San Jac An1 is listed with public access, and its status is available.
Where is Cntyofriverside San Jac An1?
Cntyofriverside San Jac An1 is at 581 S Grand Ave, San Jacinto, CA 92582. Its coordinates are 33.78237, -116.97698.
More EV charging around San Jacinto
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 160636, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cntyofriverside San Jac An1, San Jacinto, CA (AFDC station 160636)”, https://chargecensus.com/stations/california/cntyofriverside-san-jac-an1-160636 (data as of October 12, 2026).