Civic Square
AvailableEV charging station in Pleasanton, California, not on a charging network — 10 Level 2. US DOE AFDC station 227110.
At a glance
Civic Square is a public EV charging station at 4890 Bernal Ave in Pleasanton, California, not attached to a charging network. It has 10 charging ports (10 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 22, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 227110 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | Jul 22, 2022 |
| Last updated at source | Jul 15, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4890 Bernal Ave
- City
- Pleasanton
- State
- California
- ZIP
- 94566
- Coordinates
- 37.65593, -121.88026
Within ~15 km
Nearby charging
- Bishop Ranch66 ports
EV Connect · Available
- Avalon West Dublin58 ports
Loop · Available
- Bishop Ranch39 ports
EV Connect · Available
- SCIF - Pleasanton30 ports
AmpUp · Available
- Gillig30 ports
PowerFlex · Available
- Bishop Ranch 129 ports
EV Connect · Available
What kind of charging does Civic Square offer?
Of its 10 ports, 10 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.7 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a multi-unit dwelling location.
How does Civic Square compare with other stations in Pleasanton?
Pleasanton has 83 charging stations in the DOE registry with 289 ports. Civic Square accounts for 3% of the charging ports in Pleasanton. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Civic Square?
Civic Square is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 22, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Jul 15, 2026.
Frequently asked questions
How many chargers does Civic Square have?
Civic Square has 10 charging ports: 10 Level 2.
Does Civic Square have DC fast charging?
No. The registry lists no DC fast ports here; its 10 ports are all Level 2.
What connectors does Civic Square have?
Civic Square has J1772 connectors.
Is Civic Square open to the public?
Yes. Civic Square is listed with public access, and its status is available.
Where is Civic Square?
Civic Square is at 4890 Bernal Ave, Pleasanton, CA 94566. Its coordinates are 37.65593, -121.88026.
More EV charging around Pleasanton
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 227110, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Civic Square, Pleasanton, CA (AFDC station 227110)”, https://chargecensus.com/stations/california/civic-square-227110 (data as of October 12, 2026).