ChargeCensus

City Hall

Available

EV charging station in Watsonville, California on the Blink network — 3 Level 2. US DOE AFDC station 214107.

At a glance

City Hall is a public EV charging station at 250 Main Street in Watsonville, California, on the Blink network. It has 3 charging ports (3 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 25, 2021.

Total ports
3
DC fast
0
Level 2
3
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID214107
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateOct 25, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.00-$5.00/Hr Variable Parking Fee, $0.00-$0.22/kWh Variable Energy Fee

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
250 Main Street
ZIP
95076
Coordinates
36.90899, -121.75476

Within ~15 km

Nearby charging

What kind of charging does City Hall offer?

Of its 3 ports, 3 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 20% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.00-$5.00/Hr Variable Parking Fee, $0.00-$0.22/kWh Variable Energy Fee”.

How does City Hall compare with other stations in Watsonville?

Watsonville has 27 charging stations in the DOE registry with 81 ports. City Hall accounts for 4% of the charging ports in Watsonville. Blink runs 6 stations in Watsonville. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates City Hall?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 643 of those stations are in California, 3% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 25, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Hall have?

City Hall has 3 charging ports: 3 Level 2.

Does City Hall have DC fast charging?

No. The registry lists no DC fast ports here; its 3 ports are all Level 2.

What connectors does City Hall have?

City Hall has J1772 connectors.

Is charging at City Hall free?

Pricing as reported to the DOE registry: $0.00-$5.00/Hr Variable Parking Fee, $0.00-$0.22/kWh Variable Energy Fee.

Is City Hall open to the public?

Yes. City Hall is listed with public access, and its status is available.

Where is City Hall?

City Hall is at 250 Main Street, Watsonville, CA 95076. Its coordinates are 36.90899, -121.75476.

More EV charging around Watsonville

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 214107, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Hall, Watsonville, CA (AFDC station 214107)”, https://chargecensus.com/stations/california/city-hall-214107 (data as of October 12, 2026).