Chico Nissan
AvailableEV charging station in Chico, California on the In Charge network — 1 DC fast. US DOE AFDC station 39876.
At a glance
Chico Nissan is a public EV charging station at 575 Manzanita Ave in Chico, California, on the In Charge network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 26, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 39876 |
| Network | In Charge |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | Oct 26, 2021 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: $0.50 per kWh
Location
- Address
- 575 Manzanita Ave
- City
- Chico
- State
- California
- ZIP
- 95926
- Coordinates
- 39.75697, -121.84368
Within ~15 km
Nearby charging
- Chico, CA - Tesla Supercharger18 ports
Tesla Supercharger · Available
- North Creek Crossings14 ports
AmpUp · Available
Tesla Destination · Available
Tesla Destination · Available
- Carwood Skypark8 ports
Evolv Charging · Available
Tesla Destination · Available
What kind of charging does Chico Nissan offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector. Pricing as reported to the registry: “$0.50 per kWh”. The site is listed as a car dealership location.
How does Chico Nissan compare with other stations in Chico?
Chico has 45 charging stations in the DOE registry with 140 ports. Chico Nissan accounts for under 1% of the charging ports in Chico. It is the only In Charge station in Chico. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Chico Nissan?
In Charge operates 75 stations in the registry across 26 states, with 121 DC fast and 5 Level 2 ports in total. 6 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 26, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Chico Nissan have?
Chico Nissan has 1 charging port: 1 DC fast.
Does Chico Nissan have DC fast charging?
Yes. The registry lists 1 DC fast port at Chico Nissan, with CHAdeMO and CCS connectors.
What connectors does Chico Nissan have?
Chico Nissan has CHAdeMO and CCS connectors.
Is charging at Chico Nissan free?
Pricing as reported to the DOE registry: $0.50 per kWh.
Is Chico Nissan open to the public?
Yes. Chico Nissan is listed with public access, and its status is available.
Where is Chico Nissan?
Chico Nissan is at 575 Manzanita Ave, Chico, CA 95926. Its coordinates are 39.75697, -121.84368.
More EV charging around Chico
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 39876, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Chico Nissan, Chico, CA (AFDC station 39876)”, https://chargecensus.com/stations/california/chico-nissan-39876 (data as of October 12, 2026).