Cherry Orchard Building 1
AvailableEV charging station in Sunnyvale, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 463744.
At a glance
Cherry Orchard Building 1 is a public EV charging station at 250 West El Camino Real in Sunnyvale, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 17, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 463744 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 17, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 250 West El Camino Real
- City
- Sunnyvale
- State
- California
- ZIP
- 94087
- Coordinates
- 37.36781, -122.03495
Within ~15 km
Nearby charging
What kind of charging does Cherry Orchard Building 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cherry Orchard Building 1 compare with other stations in Sunnyvale?
Sunnyvale has 236 charging stations in the DOE registry with 1,003 ports, the 13th-most of 812 cities and towns in California. Cherry Orchard Building 1 accounts for under 1% of the charging ports in Sunnyvale. ChargePoint runs 191 stations in Sunnyvale. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Cherry Orchard Building 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 17, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cherry Orchard Building 1 have?
Cherry Orchard Building 1 has 1 charging port: 1 Level 2.
Does Cherry Orchard Building 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Cherry Orchard Building 1 have?
Cherry Orchard Building 1 has J1772 connectors.
Is Cherry Orchard Building 1 open to the public?
Yes. Cherry Orchard Building 1 is listed with public access, and its status is available.
Where is Cherry Orchard Building 1?
Cherry Orchard Building 1 is at 250 West El Camino Real, Sunnyvale, CA 94087. Its coordinates are 37.36781, -122.03495.
More EV charging around Sunnyvale
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 463744, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cherry Orchard Building 1, Sunnyvale, CA (AFDC station 463744)”, https://chargecensus.com/stations/california/cherry-orchard-building-1-463744 (data as of October 12, 2026).