ChargeCensus

Bwp EV Charge Tre2

Available

EV charging station in Burbank, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 256334.

At a glance

Bwp EV Charge Tre2 is a public EV charging station at 816 N Avon St in Burbank, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 15, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID256334
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 15, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
816 N Avon St
ZIP
91505
Coordinates
34.16563, -118.34359

Within ~15 km

Nearby charging

What kind of charging does Bwp EV Charge Tre2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Bwp EV Charge Tre2 compare with other stations in Burbank?

Burbank has 121 charging stations in the DOE registry with 621 ports. Bwp EV Charge Tre2 accounts for under 1% of the charging ports in Burbank. ChargePoint runs 97 stations in Burbank. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Bwp EV Charge Tre2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 15, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bwp EV Charge Tre2 have?

Bwp EV Charge Tre2 has 2 charging ports: 2 Level 2.

Does Bwp EV Charge Tre2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Bwp EV Charge Tre2 have?

Bwp EV Charge Tre2 has J1772 connectors.

Is Bwp EV Charge Tre2 open to the public?

Yes. Bwp EV Charge Tre2 is listed with public access, and its status is available.

Where is Bwp EV Charge Tre2?

Bwp EV Charge Tre2 is at 816 N Avon St, Burbank, CA 91505. Its coordinates are 34.16563, -118.34359.

More EV charging around Burbank

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 256334, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bwp EV Charge Tre2, Burbank, CA (AFDC station 256334)”, https://chargecensus.com/stations/california/bwp-ev-charge-tre2-256334 (data as of October 12, 2026).