ChargeCensus

BOA CA4-107 (Pittsburg, CA)

Available

EV charging station in Pittsburg, California on the Electrify America network — 4 DC fast. US DOE AFDC station 279353.

At a glance

BOA CA4-107 (Pittsburg, CA) is a public EV charging station at 2501 Railroad Ave in Pittsburg, California, on the Electrify America network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 22, 2023.

Total ports
4
DC fast
4
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID279353
NetworkElectrify America
StatusAvailable (E)
AccessPublic
Open dateJun 22, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Electrify America

Operates 1,221 stations in the DOE registry — view the full network →

Location

Address
2501 Railroad Ave
ZIP
94565
Coordinates
38.01171, -121.89065

Within ~15 km

Nearby charging

What kind of charging does BOA CA4-107 (Pittsburg, CA) offer?

Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is roughly in line with the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does BOA CA4-107 (Pittsburg, CA) compare with other stations in Pittsburg?

Pittsburg has 18 charging stations in the DOE registry with 44 ports. BOA CA4-107 (Pittsburg, CA) accounts for 9% of the charging ports in Pittsburg. It is the only Electrify America station in Pittsburg. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates BOA CA4-107 (Pittsburg, CA)?

The Volkswagen-founded DC fast network along highway corridors. Electrify America operates 1,221 stations in the registry across 48 states, with 6,029 DC fast and 170 Level 2 ports in total. 330 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 22, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does BOA CA4-107 (Pittsburg, CA) have?

BOA CA4-107 (Pittsburg, CA) has 4 charging ports: 4 DC fast.

Does BOA CA4-107 (Pittsburg, CA) have DC fast charging?

Yes. The registry lists 4 DC fast ports at BOA CA4-107 (Pittsburg, CA), with CCS connectors.

What connectors does BOA CA4-107 (Pittsburg, CA) have?

BOA CA4-107 (Pittsburg, CA) has CCS connectors.

Is BOA CA4-107 (Pittsburg, CA) open to the public?

Yes. BOA CA4-107 (Pittsburg, CA) is listed with public access, and its status is available.

Where is BOA CA4-107 (Pittsburg, CA)?

BOA CA4-107 (Pittsburg, CA) is at 2501 Railroad Ave, Pittsburg, CA 94565. Its coordinates are 38.01171, -121.89065.

More EV charging around Pittsburg

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 279353, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “BOA CA4-107 (Pittsburg, CA), Pittsburg, CA (AFDC station 279353)”, https://chargecensus.com/stations/california/boa-ca4-107-pittsburg-ca-279353 (data as of October 12, 2026).