Block C Garage Block C #3
AvailableEV charging station in San Marcos, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 202892.
At a glance
Block C Garage Block C #3 is a public EV charging station at 201 Campus Way in San Marcos, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 22, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 202892 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 22, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 201 Campus Way
- City
- San Marcos
- State
- California
- ZIP
- 92078
- Coordinates
- 33.13546, -117.15938
Within ~15 km
Nearby charging
- 101 Chamomile Gln44 ports
Loop · Available
- Red Rock Center28 ports
Nayax Energy · Planned
Tesla Supercharger · Available
Tesla Supercharger · Available
- EDF Renewable Energy25 ports
PowerFlex · Available
- Grand Plaza - Tesla Supercharger24 ports
Tesla Supercharger · Available
What kind of charging does Block C Garage Block C #3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Block C Garage Block C #3 compare with other stations in San Marcos?
San Marcos has 38 charging stations in the DOE registry with 196 ports. Block C Garage Block C #3 accounts for 1% of the charging ports in San Marcos. ChargePoint runs 28 stations in San Marcos. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Block C Garage Block C #3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 22, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Block C Garage Block C #3 have?
Block C Garage Block C #3 has 2 charging ports: 2 Level 2.
Does Block C Garage Block C #3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Block C Garage Block C #3 have?
Block C Garage Block C #3 has J1772 connectors.
Is Block C Garage Block C #3 open to the public?
Yes. Block C Garage Block C #3 is listed with public access, and its status is available.
Where is Block C Garage Block C #3?
Block C Garage Block C #3 is at 201 Campus Way, San Marcos, CA 92078. Its coordinates are 33.13546, -117.15938.
More EV charging around San Marcos
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 202892, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Block C Garage Block C #3, San Marcos, CA (AFDC station 202892)”, https://chargecensus.com/stations/california/block-c-garage-block-c-3-202892 (data as of October 12, 2026).