ChargeCensus

Block 54 Station 2

Available

EV charging station in Chico, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 194268.

At a glance

Block 54 Station 2 is a public EV charging station at 2297 Sadie Ln in Chico, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 26, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID194268
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 26, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2297 Sadie Ln
City
Chico
ZIP
95928
Coordinates
39.73006, -121.79266

Within ~15 km

Nearby charging

What kind of charging does Block 54 Station 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Block 54 Station 2 compare with other stations in Chico?

Chico has 45 charging stations in the DOE registry with 140 ports. Block 54 Station 2 accounts for 1% of the charging ports in Chico. ChargePoint runs 26 stations in Chico. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Block 54 Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 26, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Block 54 Station 2 have?

Block 54 Station 2 has 2 charging ports: 2 Level 2.

Does Block 54 Station 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Block 54 Station 2 have?

Block 54 Station 2 has J1772 connectors.

Is Block 54 Station 2 open to the public?

Yes. Block 54 Station 2 is listed with public access, and its status is available.

Where is Block 54 Station 2?

Block 54 Station 2 is at 2297 Sadie Ln, Chico, CA 95928. Its coordinates are 39.73006, -121.79266.

More EV charging around Chico

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 194268, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Block 54 Station 2, Chico, CA (AFDC station 194268)”, https://chargecensus.com/stations/california/block-54-station-2-194268 (data as of October 12, 2026).