Ascentris Pinnacle 2
AvailableEV charging station in San Diego, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 202022.
At a glance
Ascentris Pinnacle 2 is a public EV charging station at 10920 Via Frontera in San Diego, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 4, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 202022 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 4, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 10920 Via Frontera
- City
- San Diego
- State
- California
- ZIP
- 92127
- Coordinates
- 33.01371, -117.09423
Within ~15 km
Nearby charging
- UCSD - Theatre District117 ports
PowerFlex · Available
- Scripps Research Lab88 ports
evGateway · Available
- UCSD Pangea50 ports
PowerFlex · Available
- 101 Chamomile Gln44 ports
Loop · Available
- UCSD - Athena39 ports
PowerFlex · Available
- UCSD - Athena39 ports
PowerFlex · Available
What kind of charging does Ascentris Pinnacle 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ascentris Pinnacle 2 compare with other stations in San Diego?
San Diego has 1,037 charging stations in the DOE registry with 3,682 ports, the 2nd-most of 812 cities and towns in California. Ascentris Pinnacle 2 accounts for under 1% of the charging ports in San Diego. ChargePoint runs 732 stations in San Diego. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Ascentris Pinnacle 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 4, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ascentris Pinnacle 2 have?
Ascentris Pinnacle 2 has 2 charging ports: 2 Level 2.
Does Ascentris Pinnacle 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ascentris Pinnacle 2 have?
Ascentris Pinnacle 2 has J1772 connectors.
Is Ascentris Pinnacle 2 open to the public?
Yes. Ascentris Pinnacle 2 is listed with public access, and its status is available.
Where is Ascentris Pinnacle 2?
Ascentris Pinnacle 2 is at 10920 Via Frontera, San Diego, CA 92127. Its coordinates are 33.01371, -117.09423.
More EV charging around San Diego
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 202022, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ascentris Pinnacle 2, San Diego, CA (AFDC station 202022)”, https://chargecensus.com/stations/california/ascentris-pinnacle-2-202022 (data as of October 12, 2026).