Anaheim Towne Square
AvailableEV charging station in Anaheim, California on the EVgo network — 8 DC fast. US DOE AFDC station 461661.
At a glance
Anaheim Towne Square is a public EV charging station at 2180 E Lincoln Ave in Anaheim, California, on the EVgo network. It has 8 charging ports (8 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 23, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 461661 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 23, 2026 |
| Last updated at source | Oct 11, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2180 E Lincoln Ave
- City
- Anaheim
- State
- California
- ZIP
- 92806
- Coordinates
- 33.83881, -117.88639
Within ~15 km
Nearby charging
- Orange Ca Sdc98 ports
Non-networked · Available
- 2390 Red Hills Ave87 ports
Chargie · Available
- Mercury Insurance - Brea66 ports
PowerFlex · Available
- 2300 Red Hills Ave58 ports
Chargie · Available
- 2350 Red Hills Ave46 ports
Chargie · Available
Noodoe · Available
What kind of charging does Anaheim Towne Square offer?
Of its 8 ports, 8 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about twice the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Anaheim Towne Square compare with other stations in Anaheim?
Anaheim has 257 charging stations in the DOE registry with 793 ports, the 12th-most of 812 cities and towns in California. Anaheim Towne Square accounts for 1% of the charging ports in Anaheim. EVgo runs 3 stations in Anaheim. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Anaheim Towne Square?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 11, 2026.
Frequently asked questions
How many chargers does Anaheim Towne Square have?
Anaheim Towne Square has 8 charging ports: 8 DC fast.
Does Anaheim Towne Square have DC fast charging?
Yes. The registry lists 8 DC fast ports at Anaheim Towne Square, with CCS connectors.
What connectors does Anaheim Towne Square have?
Anaheim Towne Square has CCS connectors.
Is Anaheim Towne Square open to the public?
Yes. Anaheim Towne Square is listed with public access, and its status is available.
Where is Anaheim Towne Square?
Anaheim Towne Square is at 2180 E Lincoln Ave, Anaheim, CA 92806. Its coordinates are 33.83881, -117.88639.
More EV charging around Anaheim
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 461661, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Anaheim Towne Square, Anaheim, CA (AFDC station 461661)”, https://chargecensus.com/stations/california/anaheim-towne-square-461661 (data as of October 12, 2026).