Adobe San Jose Et4 #1
AvailableEV charging station in San Jose, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 176953.
At a glance
Adobe San Jose Et4 #1 is a public EV charging station at 321 Park Ave in San Jose, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 176953 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 321 Park Ave
- City
- San Jose
- State
- California
- ZIP
- 95113
- Coordinates
- 37.33086, -121.89326
Within ~15 km
Nearby charging
- Google249 ports
ChargePoint · Available
Blink · Available
- Google96 ports
ChargePoint · Available
- Google83 ports
ChargePoint · Available
- 23andMe - Headquarters73 ports
PowerFlex · Available
- Google63 ports
ChargePoint · Available
What kind of charging does Adobe San Jose Et4 #1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Adobe San Jose Et4 #1 compare with other stations in San Jose?
San Jose has 692 charging stations in the DOE registry with 2,899 ports, the 4th-most of 812 cities and towns in California. Adobe San Jose Et4 #1 accounts for under 1% of the charging ports in San Jose. ChargePoint runs 552 stations in San Jose. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Adobe San Jose Et4 #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Adobe San Jose Et4 #1 have?
Adobe San Jose Et4 #1 has 2 charging ports: 2 Level 2.
Does Adobe San Jose Et4 #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Adobe San Jose Et4 #1 have?
Adobe San Jose Et4 #1 has J1772 connectors.
Is Adobe San Jose Et4 #1 open to the public?
Yes. Adobe San Jose Et4 #1 is listed with public access, and its status is available.
Where is Adobe San Jose Et4 #1?
Adobe San Jose Et4 #1 is at 321 Park Ave, San Jose, CA 95113. Its coordinates are 37.33086, -121.89326.
More EV charging around San Jose
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 176953, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Adobe San Jose Et4 #1, San Jose, CA (AFDC station 176953)”, https://chargecensus.com/stations/california/adobe-san-jose-et4-1-176953 (data as of October 12, 2026).