ACCO Engineering
AvailableEV charging station in Pasadena, California on the PowerFlex network — 26 Level 2. US DOE AFDC station 171153.
Total ports
26
DC fast
0
Level 2
26
Access
Private
workplace charging
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 171153 |
| Network | PowerFlex |
| Status | Available (E) |
| Access | Private |
| Facility | Office building |
| Open date | Jun 3, 2019 |
| Last updated at source | Jun 17, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry — check the network app for current rates.
Location
- Address
- 888 E Walnut Ave
- City
- Pasadena
- State
- California
- ZIP
- 91101
- Coordinates
- 34.14899, -118.13349
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
Non-networked · Available
Non-networked · Available
- LADWP - Lincoln Heights District73 ports
Non-networked · Available
Non-networked · Available
- Caltech - California Garage71 ports
PowerFlex · Available
Frequently asked questions
How many chargers does ACCO Engineering have?
The station has 26 charging ports: 26 Level 2.
What connectors does ACCO Engineering have?
Available connectors: J1772.
Is charging at ACCO Engineering free?
No pricing is listed in the DOE registry for this station — check the PowerFlex app for current rates.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 171153, weekly full pull.