889 Arnele Ave
AvailableEV charging station in El Cajon, California on the Loop network — 2 DC fast · 3 Level 2. US DOE AFDC station 348898.
At a glance
889 Arnele Ave is a public EV charging station at 889 Arnele Ave in El Cajon, California, on the Loop network. It has 5 charging ports (2 DC fast · 3 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Dec 28, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 348898 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Dec 28, 2023 |
| Last updated at source | Sep 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 889 Arnele Ave
- City
- El Cajon
- State
- California
- ZIP
- 92020
- Coordinates
- 32.80310, -116.97326
Within ~15 km
Nearby charging
Non-networked · Available
Non-networked · Available
- Poway-Nierman22 ports
Evolv Charging · Available
- El Cajon Venture20 ports
Evolv Charging · Available
- Zion20 ports
Evolv Charging · Available
Tesla Supercharger · Available
What kind of charging does 889 Arnele Ave offer?
Of its 5 ports, 2 are DC fast and 3 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% above the California average of 3.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a other location.
How does 889 Arnele Ave compare with other stations in El Cajon?
El Cajon has 83 charging stations in the DOE registry with 239 ports. 889 Arnele Ave accounts for 2% of the charging ports in El Cajon. It is the only Loop station in El Cajon. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates 889 Arnele Ave?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 591 of those stations are in California, 3% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 28, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.
Frequently asked questions
How many chargers does 889 Arnele Ave have?
889 Arnele Ave has 5 charging ports: 2 DC fast · 3 Level 2.
Does 889 Arnele Ave have DC fast charging?
Yes. The registry lists 2 DC fast ports at 889 Arnele Ave, with CCS connectors.
What connectors does 889 Arnele Ave have?
889 Arnele Ave has J1772 and CCS connectors.
Is 889 Arnele Ave open to the public?
Yes. 889 Arnele Ave is listed with public access, and its status is available.
Where is 889 Arnele Ave?
889 Arnele Ave is at 889 Arnele Ave, El Cajon, CA 92020. Its coordinates are 32.80310, -116.97326.
More EV charging around El Cajon
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 348898, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “889 Arnele Ave, El Cajon, CA (AFDC station 348898)”, https://chargecensus.com/stations/california/889-arnele-ave-348898 (data as of October 12, 2026).