800 North Brand 800 Nb Ev4
AvailableEV charging station in Glendale, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 159081.
At a glance
800 North Brand 800 Nb Ev4 is a public EV charging station at 800 N Brand Blvd in Glendale, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 159081 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 800 N Brand Blvd
- City
- Glendale
- State
- California
- ZIP
- 91203
- Coordinates
- 34.15768, -118.25360
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
- G3120 ports
Blink · Available
Non-networked · Available
Non-networked · Available
- G294 ports
Blink · Available
- Tesla Diner - Tesla Supercharger80 ports
Tesla Supercharger · Available
What kind of charging does 800 North Brand 800 Nb Ev4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 800 North Brand 800 Nb Ev4 compare with other stations in Glendale?
Glendale has 74 charging stations in the DOE registry with 281 ports. 800 North Brand 800 Nb Ev4 accounts for under 1% of the charging ports in Glendale. ChargePoint runs 45 stations in Glendale. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates 800 North Brand 800 Nb Ev4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 800 North Brand 800 Nb Ev4 have?
800 North Brand 800 Nb Ev4 has 2 charging ports: 2 Level 2.
Does 800 North Brand 800 Nb Ev4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 800 North Brand 800 Nb Ev4 have?
800 North Brand 800 Nb Ev4 has J1772 connectors.
Is 800 North Brand 800 Nb Ev4 open to the public?
Yes. 800 North Brand 800 Nb Ev4 is listed with public access, and its status is available.
Where is 800 North Brand 800 Nb Ev4?
800 North Brand 800 Nb Ev4 is at 800 N Brand Blvd, Glendale, CA 91203. Its coordinates are 34.15768, -118.25360.
More EV charging around Glendale
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 159081, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “800 North Brand 800 Nb Ev4, Glendale, CA (AFDC station 159081)”, https://chargecensus.com/stations/california/800-north-brand-800-nb-ev4-159081 (data as of October 12, 2026).