ChargeCensus

7901 Ventura Canyon Ave

Available

EV charging station in Los Angeles, California on the Loop network — 5 Level 2. US DOE AFDC station 398841.

At a glance

7901 Ventura Canyon Ave is a public EV charging station at 7901 Ventura Canyon Ave in Los Angeles, California, on the Loop network. It has 5 charging ports (5 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 17, 2020.

Total ports
5
DC fast
0
Level 2
5
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID398841
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateDec 17, 2020
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
7901 Ventura Canyon Ave
ZIP
91402
Coordinates
34.21433, -118.42928

Within ~15 km

Nearby charging

What kind of charging does 7901 Ventura Canyon Ave offer?

Of its 5 ports, 5 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% above the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does 7901 Ventura Canyon Ave compare with other stations in Los Angeles?

Los Angeles has 2,123 charging stations in the DOE registry with 10,316 ports, the most of 812 cities and towns in California. 7901 Ventura Canyon Ave accounts for under 1% of the charging ports in Los Angeles. Loop runs 296 stations in Los Angeles. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates 7901 Ventura Canyon Ave?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 591 of those stations are in California, 3% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 17, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does 7901 Ventura Canyon Ave have?

7901 Ventura Canyon Ave has 5 charging ports: 5 Level 2.

Does 7901 Ventura Canyon Ave have DC fast charging?

No. The registry lists no DC fast ports here; its 5 ports are all Level 2.

What connectors does 7901 Ventura Canyon Ave have?

7901 Ventura Canyon Ave has J1772 connectors.

Is 7901 Ventura Canyon Ave open to the public?

Yes. 7901 Ventura Canyon Ave is listed with public access, and its status is available.

Where is 7901 Ventura Canyon Ave?

7901 Ventura Canyon Ave is at 7901 Ventura Canyon Ave, Los Angeles, CA 91402. Its coordinates are 34.21433, -118.42928.

More EV charging around Los Angeles

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 398841, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “7901 Ventura Canyon Ave, Los Angeles, CA (AFDC station 398841)”, https://chargecensus.com/stations/california/7901-ventura-canyon-ave-398841 (data as of October 12, 2026).